Skip to content
Collective Solar

Solar panels in Calabasas

Solar panels in Calabasas follow different rules than the Valley next door. Calabasas is a city of its own, so LADWP does not serve it. Southern California Edison delivers the power, Clean Power Alliance buys it, and the city's default is CPA's 100% Green Power option. The State Fire Marshal's latest map shades the city Very High for fire hazard, and the city flags ten of the Edison circuits that serve it for Public Safety Power Shutoffs. We design Calabasas systems around all of that from our Northridge office, and we handle the city permit and the Edison paperwork.

Edison delivers it, Clean Power Alliance buys it

Cross into Woodland Hills or West Hills, both part of the City of Los Angeles, and the bill comes from LADWP, which credits solar under its own net metering program. In Calabasas, Southern California Edison sends the bill, delivers the electricity and handles maintenance and service problems.

The electricity itself is bought by Clean Power Alliance, a publicly owned, not-for-profit provider. Calabasas joined in 2017, and CPA has served customers here since 2019. The city picked CPA's 100% Green Power option as its default, so an account stays there unless the customer picks another tier. You can step down to Clean Power (50% clean) or Lean Power (40% clean), or opt out and buy your generation from Edison. The city's FAQ offers those same choices, plus CPA's bill-assistance programs, to residents who find the top tier too pricey.

Your tier sets the price of the power your panels replace. Under net billing, a kilowatt-hour you make and use at the same moment saves the full retail rate: CPA's generation charge for your tier plus Edison's delivery charge. A kilowatt-hour sent to the grid earns an export credit instead. Systems that applied to connect after August 31, 2023 go on CPA's Solar Billing Plan, which credits exports at hourly values from the CPUC's Avoided Cost Calculator. Those values usually sit well below what you pay to buy power. CPA settles its side of the bill once a year, at an April true-up.

So we size a Calabasas array to your hour-by-hour usage, not to the edges of the roof, and we price storage as its own line. A battery carries midday power into the evening, when the house would otherwise buy it at full price. That trade is worth more here than on LADWP, and our solar battery guide for Los Angeles shows the math.

Paying cash? A purchase no longer comes with a federal tax break, because the residential solar credit expired on December 31, 2025. Our lease-versus-buy comparison lays out the zero-down alternatives.

Permits, the 10 kW line, oak trees and your HOA

The permit is the city's. Solar permits here come from the City of Calabasas Building and Safety Division at 100 Civic Center Way, not LADBS or Los Angeles County. Most home rooftop systems can use SolarAPP+, an automated online plan check. A residential roof-mount from 1.0 to 38.4 kW (AC) that passes gets an approval letter. The letter and plan set go into the city's portal, and the city emails the permit once staff find the file complete. Ground mounts, parking shade structures and commercial roofs take the standard permit.

Two exceptions. SolarAPP+ does not cover a system tied into a main electrical panel rated above 225 amps at its busbar, or a Class A re-roof, which gets its own permit. We check the panel and the roof at the site visit, so the permit path is settled before you sign. The interconnection application goes to Edison, and we file that one too.

The 10 kW planning line. A rooftop system under 10 kW (AC) needs no planning permit, only the building permit. Any other solar project, including a bigger rooftop array or a ground mount on a hillside lot, also needs a Zoning Clearance from the Planning Division. If your usage calls for more, you hear about that step while we are still drawing.

Oak trees are protected. Under the city's Oak Tree Ordinance, Section 17.32 of the municipal code, owners contact the Planning Division before pruning or removing any oak, and before construction or earthwork with an oak within 200 feet. Pruning an oak generally takes an Oak Tree Permit; a minor permit covers narrower cases, such as trimming for safe clearance from a structure. When an oak shades the roof, we design around it with another roof plane, module-level electronics or a smaller array instead of counting on a trim.

Your HOA gets a say, not a veto. The city's guide to its Edison circuits names more than 50 associations and communities, from The Oaks of Calabasas to Mont Calabasas and Saratoga Hills. State law is on the owner's side here: under Civil Code 714, an HOA rule that effectively blocks solar cannot be enforced. An association may still set reasonable conditions, and for rooftop panels the statute draws the line at $1,000 of added cost over the system as proposed, or a loss of more than 10 percent in efficiency. The board has to answer in writing, and silence counts as a yes: if it has not turned you down 45 days after receiving your application, the application stands approved, unless the board held it up with a reasonable request for additional details.

In a condo or townhome, Civil Code 714.1 also lets the association control solar on common areas and set rules for roof upkeep and repair. It still cannot ban rooftop solar on the building you live in, or put your installation to a member vote. We build the HOA submittal around your association's written conditions.

Own a building on the commercial stretch of Agoura Road near Lost Hills Road, or near The Commons? Commercial roofs take the standard permit, and the federal commercial clean-energy credit, unlike the residential one, still exists in 2026 with conditions. Our commercial solar page walks through how those projects run.

Fire zones, shutoff circuits and the case for a battery

The State Fire Marshal's latest hazard map for Calabasas, dated March 24, 2025, shades the city Very High, the only hazard class on its legend. The city notes that homes in high or very high zones can fall under the state's wildfire building standards and the defensible-space rules of Public Resources Code 4291. Fire protection here is contracted to the Los Angeles County Fire Department.

Fires have reached Calabasas before. CAL FIRE's record of the November 2018 Woolsey Fire lists 96,949 acres burned across Los Angeles and Ventura counties and 1,643 structures destroyed. The county's after-action review logs mandatory evacuations in parts of Calabasas and fire reported at the 101 at Parkway Calabasas. It also lists older local fires, including the 1996 Calabasas Fire, which ran from Malibu Canyon to the coast.

On the roof, fire rules show up twice. The re-roofing permit that SolarAPP+ leaves out is one the city lists as Class A, the top fire rating for roof coverings, so a roof near the end of its life should be replaced under that permit before an array goes on. If panels are already up, our panel removal and reinstall service takes them off and puts them back. The state's residential code also requires rooftop arrays to be tested, listed and identified with a fire classification under UL 2703, so we pick panels and racking as a matched set. On tile, we plan mounts and flashing for tile and replace cracked pieces before the array covers them.

Then there is the power. On its Public Safety Power Shutoff page, the city maps the Edison circuits that serve Calabasas and flags ten as PSPS circuits, the lines Edison may switch off when wind and dry brush make a spark too dangerous. Its guide marks Parkmore as non-PSPS, and the map draws one more non-PSPS line, the Calabasas circuit, which the guide does not describe.

Edison circuit Where the city says it runs Some of the places the city names
Horntoad Mulholland Highway into the Calabasas Highlands Mulholland Heights, Greater Mulwood, Mountain Park
Paradise Old Topanga Canyon Road past Mulholland Highway Calabasas Country Estates, Old Topanga, Viewpoint School
Plateau Las Virgenes Canyon Road, Mulholland Highway east, Cold Canyon Road Deer Springs, Mira Monte, Calabasas View
Milo Las Virgenes Road across the 101 to Agoura Road Mont Calabasas, Las Virgenes Park, The Colony at Calabasas
Rhoda Lost Hills Road to Agoura Road and Liberty Canyon Road Saratoga Hills, Saratoga Ranch
Sienna Brent's Junction, Mureau Road and Mountain View Drive to Parkway Calabasas Alizia Canyon, Malibu Canyon Townhomes
Sorrento Park Sorrento through City Hall and The Commons to Park Ora Las Villas Calabasas, Park Sorrento Condos
Vicasa Park Ora, Paul Revere Drive and Mulholland Highway Braewood, Creekside Calabasas Park, Serenata, Woodland Terrace
Crumner Agoura Road east past Lost Hills Road The commercial area and the Calabasas Community Center
Horizon Mostly Hidden Hills, then Valley Circle into Park Sorrento No associations listed
Parkmore (non-PSPS) Parkway Calabasas, Park Granada and Park Sienna The Oaks of Calabasas, Calabasas Park Estates, Calabasas Hills

Source: the City of Calabasas circuit map (dated July 2023) and its guide to Edison circuits and associations. Edison decides which lines to de-energize in each event, so check its outage page during fire weather.

These are not paper risks. In January 2025 the city posted that it was pressing Edison for updates on restoring power. Later that month it shared updated hours for an Edison resource center at the Calabasas Community Center, where residents could charge phones and portable medical equipment.

Panels alone go dark in any outage. A grid-tied inverter shuts down the moment the grid drops, on purpose, so it never sends power into wires a lineworker may be fixing. Add a battery and a transfer switch, and the circuits you choose stay on: refrigerator, lights, router, a medical device.

Your circuit changes the math. On one of the ten PSPS circuits, backup alone may justify a battery. On a line the city lists as non-PSPS, such as Parkmore, the bill savings have to carry more of the case. Clean Power Alliance's Sun Storage Rebate adds an extra incentive for homes in areas often affected by shutoffs, and CPA decides which homes count. CPA also requires a licensed contractor to install the battery, which we line up as part of the project. The money is limited and first come, first served, so check CPA's current terms. Every Calabasas quote we write shows the system with and without storage.

Already have panels that stopped producing? Our solar repair team works on arrays other companies installed, including companies that have since closed. New projects follow our solar installation process from design to permission to operate, and our service areas page shows which utility serves each city we cover.

Calabasas solar questions

Who supplies electricity in Calabasas: LADWP, Edison or Clean Power Alliance?

Edison and Clean Power Alliance, not LADWP. Calabasas is a separate city, outside LADWP territory. Southern California Edison bills you and delivers the power, and Clean Power Alliance buys the electricity on the city's default 100% Green Power option unless you choose another tier or opt out. Because Edison is investor-owned, new solar systems here fall under the state's net billing rules, and CPA credits their exports under its own Solar Billing Plan.

Can my Calabasas HOA stop me from installing solar panels?

No, but it can set conditions. Under Civil Code 714, an HOA rule that effectively blocks solar is void, and only reasonable restrictions survive. For rooftop panels the statute sets that limit at $1,000 of added cost over the system as proposed, or a loss of more than 10 percent in efficiency. If the board has not said no in writing 45 days after it received your application, the application counts as approved, unless the board asked for reasonable additional details.

Can I cut back an oak that shades my roof?

Not without checking with the city first. Calabasas protects oaks under Section 17.32 of its municipal code. Contact the Planning Division before pruning or removing any oak, and expect most pruning to need an Oak Tree Permit. We design around oak shade first, so your solar plan does not depend on a tree permit.

Will solar panels keep my lights on during an Edison power shutoff?

Not by themselves. A grid-tied system turns off in any outage, including a Public Safety Power Shutoff, so you need a battery and transfer equipment to keep circuits running. The city flags ten Edison circuits that serve Calabasas as PSPS circuits, and Clean Power Alliance's Sun Storage Rebate pays extra toward a battery for homes in areas often affected by shutoffs, while funding lasts.

How do I choose the best solar company in Calabasas?

Put the same five Calabasas questions to each company. Does the quote use Edison delivery plus your Clean Power Alliance tier, not LADWP rules? Is the design above or below the city's 10 kW planning line, and does it qualify for SolarAPP+? What is the plan if an oak shades the roof? Is storage priced as its own line, and is your home on a PSPS circuit? Who services the system afterward? Collective Solar works from Northridge, services systems whoever installed them, and is rated 4.8 stars from 50 Google reviews.

Solar in Calabasas, by the numbers

State records show 1,497 home solar systems connected to Edison's grid in ZIP 91302 through May 2026. In the 12 months to May 2026, 174 were connected, up from 97 the year before, and 161 of them came with a battery.

1,497

home solar systems on Edison's grid, through May 2026

174

connected in the 12 months to May 2026

93%

of the systems connected in those 12 months came with a battery

Source: California Distributed Generation Statistics, Interconnected Project Sites data set, residential solar through May 2026, for ZIP 91302. Edison records a battery or panels added to an existing system as a separate entry. We left out the ones the records identify, but the all-time total may still count some homes twice. ZIP codes don't follow city limits exactly. ZIP 91302 also covers Hidden Hills.

Get a free solar estimate for your Calabasas home

Priced on Edison delivery and your Clean Power Alliance tier, permitted through the City of Calabasas, with storage shown as its own line.