Most Los Angeles homeowners pay about $2.75–$3.75 per watt for a complete solar panel system in 2026. For the 4–8 kW system most San Fernando Valley homes need, that is roughly $12,000–$30,000 installed. A home battery adds about $12,000–$18,000. If you would rather not pay up front, a zero-down lease (or, on Edison, a PPA) swaps the purchase price for a monthly payment, and most of our customers pay less per month than their current electric bill from day one.
These are typical Southern California market ranges, not a quote. The rest of this page explains what moves your number, why your utility matters more than the panel brand, and how to compare two quotes fairly.
What does a typical solar system cost in Los Angeles?
System size follows your last 12 months of electric bills. Here is how size and price usually line up:
| Home | System size | Typical installed price |
|---|---|---|
| Smaller home or low usage (bills under about $150/month) | 4–5 kW | $12,000–$18,000 |
| Typical Valley home (bills about $200–$300/month, summer AC) | 6–8 kW | $17,000–$30,000 |
| Large home, pool, EV, or all-electric | 9–12 kW | $26,000–$42,000 |
| Home battery (for example a Tesla Powerwall or Enphase battery) | Added on | $12,000–$18,000 each |
Larger systems usually cost less per watt, because permits, design and setup are spread over more panels. To check your own numbers against your bill, try the solar savings calculator.
What moves the price up or down?
- How much power you use. Summer air conditioning is usually the biggest driver in the Valley. A system sized to your real usage costs less than one sized to fill the roof.
- Your roof. Tile and steep or complicated roofs take longer to work on than composition shingle. If your roof needs replacing in the next few years, do it before the panels go on. See roof and solar in one project.
- Your electrical panel. Some older homes still have 100-amp panels that can't take solar plus modern loads. That work is priced separately; see electrical panel upgrades.
- Equipment. The panel brand, and a string inverter versus microinverters, change both the price and the warranty.
- A battery. It adds cost, but it changes what each kilowatt-hour is worth, especially on SCE (see below).
- Permits and utility paperwork. City permits and utility interconnection are part of every install. We handle them, and they are included in the quotes we give.
LADWP vs. SCE: why your utility changes the math
Where you live decides which utility credits your solar, and that changes your savings more than the panel brand does.
- LADWP serves nearly every address inside the City of Los Angeles, including Northridge, Granada Hills, Reseda and Van Nuys. It is not on the state's NEM 3.0. Its own net metering rider nets the power you send out against the power you use each billing period, so a rooftop system without a battery often does the job. Details: LADWP solar net metering.
- Southern California Edison (SCE) serves cities such as Calabasas, Hidden Hills, San Fernando and Santa Clarita. New solar there goes on the Net Billing Tariff, which credits exports at hourly values that are usually below retail. A battery that stores daytime solar for the evening more often earns its place. Details: SCE's net billing tariff.
- Burbank Water and Power and Glendale Water and Power set their own rules. Burbank moved new solar to net billing for permits applied for from January 1, 2026; Glendale still offers net metering to new customers. We will walk you through yours before you sign.
Should you buy, finance, lease or sign a PPA?
| Option | Upfront cost | Who owns the system | Good fit if… |
|---|---|---|---|
| Cash purchase | Full price | You | You want the most savings over 25 years |
| Solar loan | Zero to low | You | You want to own it without paying cash up front |
| Lease | Zero | The leasing company | You want a set monthly payment and no maintenance |
| PPA (Edison customers; LADWP does not allow PPAs) | Zero | The provider; you pay per kWh produced | You want to pay only for the power the panels make |
The federal residential tax credit for purchased systems ended December 31, 2025. Leases, and PPAs for Edison customers, can still pass incentives through, which changed the math on how to pay. Read the solar tax credit in 2026 before you compare quotes, and see our solar lease vs. buy guide for the side-by-side.
How to read a solar quote
- Find the price per watt. Divide the total price by the system size in watts (a 7 kW system is 7,000 watts). It is the fairest way to compare two quotes.
- Check the production estimate. It should be in kWh per year and based on your roof's direction and shade, not a round number.
- Ask who installs it and who services it later. Ask what happens if the company closes. It happens more than people expect; see what to do when your solar company goes out of business.
- Look for the escalator on a lease or PPA. A yearly increase of a few percent compounds over a 20–25 year contract. See how a solar PPA works.
- Make sure the savings use your utility's real rules. LADWP, SCE, Burbank and Glendale all credit solar differently. A generic national savings number tells you very little.
Ways to lower the cost of going solar
- Size the system to your real usage, not to the biggest array the roof fits.
- Replace an old roof before solar, not after. Removing and reinstalling panels later is a separate job; see panel removal and reinstall.
- On SCE, look at a battery so more of your solar covers evening use.
- Get at least two quotes and compare them by price per watt.
When you are ready for a real number, see how solar panel installation works with us, from the bill review to turning the system on.